1 Company presentation Part 2A-1 Underpinning I-2006 (rev. XII-2012) (Part 2A, PP 2007, animation+p/r : ) Copyright notice Unauthorised copying of this presentation as whole or in parts in any form or by any means, electronic, photocopying, recording or otherwise, without prior written permision is prohibited. ready
NAJDER engineering ®NAJDER engineering ® is a consulting company as well as a specialist contractor within civil and foundation engineering. We are preparing technical concepts, design projects, analyses and performing jobs as a subcontractor. Skånska Cementgjuteriet Skanska ABTomasz Najder joined in the period of Skånska Cementgjuteriet (today Skanska AB) as a member of Supervising Team on the project “Second Dry Dock in Gdynia Shipyard”. Stabilator AB Skanska Group Stabilator Sp. z o.o. Skanska Group Tomasz Najder gained his experiences in Stabilator AB (daughter company in Skanska Group) as site manager, project manager and internal consultant (”trouble-shooter”), as Production Manager (Stabilator AB- International Division in Poland), in Polish-Swedish company Stabilator Sp. z o.o. (Skanska Group) as Vice President and Executive Manager. Polibeton Sp. o.o. Najder engineering ® Polimark InternationalAnna Elżbieta Najder (wife) owned Polish company Polibeton Sp. o.o. and now Swedish Najder engineering ® since 1997 (until 2005 operating as Polimark International) – operating globally. Najder engineering ®Anna Monika Najder (daughter) together with Tomasz Najder (as the President of the Board and Executive Manager) owned Polish Najder engineering ® operating in Poland. since six generations.Family Najder is working within mining, tunneling and civil engineering since six generations. Family and company history in civil engineering 2 ready
3 3 Foundation engineering and soil investigations. Reinforcement of existing foundations (underpinning) of industrial buildings, housing estates and ancient monuments (piling, anchors, injections).Reinforcement of existing foundations (underpinning) of industrial buildings, housing estates and ancient monuments (piling, anchors, injections). Tunneling, rock stability and soil improvement (deep mixing method, high/low-pressure injection, lime-cement columns). Stabilization of slopes and embankments (geogrids, soil reinforcement, drainage, geotextiles). Sealing of existing embankments, dams, dikes and waste deposits. Flood defense. Coast protection. Biological engineering, gabion constructions. Leakage and moisture counteraction (insulations, drainages, sealing injections, dilatation repair) in concrete and brickworks structures. Field of activity ready
4 FOUNDATION ENGINEERING incl. underpinning with micropiles and soil investigations Piles and…micropiles Sheet pile walls Tie-back walls ready Works performed by Stabilator AB and Stabilator Sp. o.o. (Ltd) under leadership of TNa as Managing Director in the period
5 SOIL IMPROVEMENT especially incl. lime/cement columns, high- and low pressure injections and different types of nettings and reinforcement Lime/cement columns Cement and chemical injections Gorczyca Lock at Augustowski Channel Works performed by Stabilator AB and Stabilator Sp. o.o. (Ltd) under leadership of TNa as Managing Director in the period ready
6 TNA-anchors TNA-anchors developed at Södermalmstorg / Stockholm conventional procedure of injection TNa anchor press inventor of the new type of injection anchors TNa was the designer, Contract Manager, Site Manager and inventor of the new type of injection anchors applied in the project The rescued building today ready
7 Underpinning Malbork Castle (Marienburg) The Royal Castle in Warsaw (Warszawa) Examples of designed and performed projects
8 Malbork the author of the concept Main underpinning works performed by Stabilator AB under leadership of TNa as the author of the concept, Contract Manager, partially Site Manager and Area Manager in the period ready Teutonic Knights Castle
9 fosa P d,P ś NmNmNmNm nM River Nogat (~ 1300r.) Zamek Średni w Malborku: fundament Ściany Zachodniej z początku XIVw. -fundament Ściany Zachodniej z początku XIVw. Drobnowymiarowe pale pod głazami spełniały rolę wzmocnienia gruntu piaszczystego poprzez jego zagęszczenie. Nie popełniono teraz błędnego oparcia Ściany Zachodniej bezpośrednio na gruncie, tak jak w przypadku Muru Zerowego. Oryginalny fundament Ściany Zachodniej w najniższej partii budowano z głazów, układanych pomiędzy obramowanie z dębowych belek. Drobnowymiarowe pale pod głazami spełniały rolę wzmocnienia gruntu piaszczystego poprzez jego zagęszczenie. Nie popełniono teraz błędnego oparcia Ściany Zachodniej bezpośrednio na gruncie, tak jak w przypadku Muru Zerowego. Prace przy fundamencie starano się prowadzić przy obniżonym poziomie wody w rzece. Pomiędzy kolejne warstwy głazów i kamieni wyżej układane sypano wapno palone. Prace te wykonywano również przy niskim poziomie wody w rzece Nogat. CaO CaCO 3. Po podniesieniu się wody CaO zamieniało się w trwałe CaCO 3. Technologia taka była prekursorem tzw. betonowania podwodnego. Powyżej maksymalnego poziomu wody w Nogacie i fosie zamkowej murowano ścianę z cegły na zaprawie wapiennej. ochrony przed podciąganiem wody i wilgoci. Zamysł budowniczych dotyczył ochrony przed podciąganiem wody i wilgoci. Z czasem fosę zasypano, między innymi z powodu osiadania Ściany i jej pękania przy opróżnianiu fosy z wody celem jej oczyszczenia. Celem uniknięcia powtarzającycych się katastrofalnych powodzi uregulowano Nogat w 1916r. śluzami. Poziom wody u podnóża Zamku obniżył się o ok. 1,80m. Drewniany w dolnej swej części fundament średniowieczny zaczął powoli gnić. Fundament tzw. Muru Zerowego a później Ściany Zachodniej zlokalizowano na krawędzi wysoczyzny polodowcowej nad brzegiem Nogatu. Prace rozpoczęto od wykopu w gruntach składajacych się piasku z domieszkami gliniastymi. z piasku z domieszkami gliniastymi. W dolnym poziomie namuły posadowienia w osi fundamentu niefortunnie zalegały namuły naniesione przez rzekę Nogat. naniesione przez rzekę Nogat. Pod nimi znajdowały się osady piasków średnich i drobnych, również pochodzenia rzecznego. Jako tzw. jednofrakcyne również mogły się okazać nienośne dla planowanego grubego muru o znacznym ciężarze. ~ 1300 r. ok r. ok. 1600r r fosa Pg 1989 r. osiadania CaO Ca(OH) 2 CaCO 3 X History of Western Wall – reason of settlements problem press ready
10 ok. 1320r. 1991r wielobok sił Concept of underpinning ready the inventor of the new type of injection micropiles TNa was the inventor of the new type of injection micropiles applied in the project
11 press ready TNa micropiles TNa micropiles inside the cellar of the castleConcrete beams outside the castle walls
Thank You for Your attention! ready 12 THE END
ready Welcome to 13
14 ready
15 ready
16 ready
17 ready